Background
The project site is equipped with several piling rigs powered by diesel generators. Due to significant load fluctuations during operation, the generators often run under unstable conditions, leading to reduced efficiency and increased operational stress.
- Load condition:1 × static pressure pile 280KW + 2 × pile driver180KW + site office 40KW
Solution
2 × PowerCat-YD250P + Sync 2 × generator 320kVA
This integration ensures a stable, uninterrupted power supply for the crane while significantly reducing fuel use, emissions—enabling greener, more efficient construction.