Background
The project is located at a city center construction site, surrounded by office and residential buildings with strict environmental standards. The tower crane was originally powered by a diesel generator, which frequently malfunctioned due to fluctuating power demand—reducing efficiency and producing noise and exhaust that disturbed nearby residents.
- Load condition:2 × tower crane 50ton、2 × Passenger elevator 40kW
Solution
1 × PowerCat-YD300C + Sync generator 200kVA
This integration ensures a stable, uninterrupted power supply for the crane while significantly reducing fuel use, emissions—enabling greener, more efficient construction.






