Construct island engineering


Background

The project is located in a remote area with no access to the utility grid, relying entirely on diesel generator sets to supply power. This results in extremely high operation and maintenance costs, significantly limiting overall profitability.

  • Load condition:Vibro hammer 400KW + air compressor 90KW + electric machine 30KW + gravel pile 520KW

 

Solution

1 × PowerCat-YD250P + Sync generator 400kVA

This integration ensures reliable power for high-impact loads while minimizing diesel consumption.