Construct high-speed road


Background

The project involves the construction of a highway, where the site is equipped with 12 units of 70 kW piling rigs. The equipment operates with high power demand and strong load fluctuations.Due to limited grid access and peak demand pressure, the project relies on diesel generators for power supply, resulting in low efficiency and high fuel consumption.

  • Load condition:12 × pile driver 70KW

 

Solution

1 × PowerCat-YD250P + Sync 2 × generator 400kVA

This integration ensures a stable, uninterrupted power supply for the crane while significantly reducing fuel use, emissions—enabling greener, more efficient construction.