
Construct high-speed road
Background The project involves the construction of a highway, where the site is equipped with 12 units of 70 kW piling rigs. The equipment operates

Background The project involves the construction of a highway, where the site is equipped with 12 units of 70 kW piling rigs. The equipment operates

Background The project involves the construction of an underground parking garage in an urban area. The site load mainly includes four 70 kW piling rigs

Background The project site is equipped with several piling rigs powered by diesel generators. Due to significant load fluctuations during operation, the generators often run

Background This construction project is located on the Tibetan Plateau, where extreme environmental conditions and the absence of grid access make power supply particularly challenging.

Background The industrial park has high electricity demand for both production and daily living. Load condition:8 × gantry crane 185ton+ 1 × site office 20KW Solution 1 × PowerCat-YD300C

Background The project is located in a remote area with no access to the utility grid, relying entirely on diesel generator sets to supply power.

Background This project is located in a suburban area and is covered by the utility grid. The on-site transformer has a capacity of 200 kVA.

Background The project is located at a city center construction site, surrounded by office and residential buildings with strict environmental standards. The tower crane was

Background & Challenge The Xiamen–Jinmen Bridge (Xiamen Section) is a key infrastructure project in Fujian Province, with a total length of19.6 km. The construction site